Project Deepwater: Difference between revisions

From Citizendium
Jump to navigation Jump to search
imported>George Swan
(add reference)
mNo edit summary
 
(3 intermediate revisions by 2 users not shown)
Line 1: Line 1:
{{subpages}}
{{subpages}}
{{Image|Updated deepwater poster, circa 2006.jpg|right|350px|Poster of Project Deepwater's projects approximately a year prior to management being returned to the Coast Guard.}}
{{Image|Updated deepwater poster, circa 2006.jpg|right|350px|Poster of Project Deepwater's projects approximately a year prior to management being returned to the Coast Guard.}}
'''Project Deepwater''' was an ambitious plan to upgrade the capabilities of the [[United States Coast Guard]] following [[al Qaeda]]'s attacks in the [[United States|Continental USA]] on September 11th, 2001.<ref>
'''Project Deepwater''' was an ambitious plan to upgrade the capabilities of the [[United States Coast Guard]] following [[al-Qaeda]]'s attacks in the [[United States of America|Continental USA]] on September 11th, 2001.<ref>
{{cite news
{{cite news
| url=http://www.militaryaerospace.com/index/display/article-display/194041/articles/military-aerospace-electronics/volume-14/issue-12/news/coast-guard-electronics-upgrade-program-kicks-into-high-gear.html
| url=http://www.militaryaerospace.com/index/display/article-display/194041/articles/military-aerospace-electronics/volume-14/issue-12/news/coast-guard-electronics-upgrade-program-kicks-into-high-gear.html
Line 57: Line 57:


==Refit to extend the Island class cutters==
==Refit to extend the Island class cutters==
The [[USCG Island class]] cutters were required a mid-life refit.  The refit was to add capabilities, as a stop-gap, until more modern vessels like the [[Fast Response Cutter]] was ready.  Eight of the 57 vessels of the class were extended, to add a [[stern launching ramp]].  Their refit went over-budget, was delayed, and, when the extended vessels were relaunched, they were found to be fundamentally unsafe.   
The [[USCG Island class]] cutters were required a mid-life refit.  The refit was to add capabilities, as a stop-gap, until more modern vessels like the [[Fast Response Cutter]] was ready.  Eight of the 57 vessels of the class were extended, to add a [[stern launching ramp]].  Their refit went over-budget, was delayed, and, when the extended vessels were relaunched, they were found to be fundamentally unsafe.   


==Fast Response Cutter -- version A==
==Fast Response Cutter -- version A==
The replacement for the Island class cutters was to be the Fast Response cutter, which was to be built incorporating novel materials, like a composite hull.   
The replacement for the Island class cutters was to be the Fast Response cutter, which was to be built incorporating novel materials, like a composite hull.   
In 2007 Allen announced that the original design would be abandoned, and an alternate design, Fast Response Cutter -- version B, would be built instead.  The alternate design would focus on proven, "off the shelf" technology.   
In 2007 Allen announced that the original design would be abandoned, and an alternate design, Fast Response Cutter -- version B, would be built instead.  The alternate design would focus on proven, "off the shelf" technology.   
The alternate design had a steel hull, and aluminum superstructure.  Its design was a modification of a proven design liscenced from the Dutch shipbuilding consortium the [[Damen Group]].
The alternate design had a steel hull, and [[aluminium]] superstructure.  Its design was a modification of a proven design licensed from the Dutch shipbuilding consortium the [[Damen Group]].


==References==
==References==
<references/>
{{reflist}}[[Category:Suggestion Bot Tag]]

Latest revision as of 16:00, 7 October 2024

This article is a stub and thus not approved.
Main Article
Discussion
Related Articles  [?]
Bibliography  [?]
External Links  [?]
Citable Version  [?]
 
This editable Main Article is under development and subject to a disclaimer.
(PD) Image: USCG
Poster of Project Deepwater's projects approximately a year prior to management being returned to the Coast Guard.

Project Deepwater was an ambitious plan to upgrade the capabilities of the United States Coast Guard following al-Qaeda's attacks in the Continental USA on September 11th, 2001.[1][2][3][4][5] A consortium of Aerospace companies Lockheed Martin and Northrop Grumman were originally the "lead systems integrator". The consortium of the two companies originally enjoyed a controversial amount of authority overseeing subcontractors. Several of the subprojects the consortium oversaw went overbudget, were delayed, or were total failures. In 2007 Thad Allen, then the Commandant of the Coast Guard, announced that the Coast Guard would take over direct management of all the projects.

Refit to extend the Island class cutters

The USCG Island class cutters were required a mid-life refit. The refit was to add capabilities, as a stop-gap, until more modern vessels like the Fast Response Cutter was ready. Eight of the 57 vessels of the class were extended, to add a stern launching ramp. Their refit went over-budget, was delayed, and, when the extended vessels were relaunched, they were found to be fundamentally unsafe.

Fast Response Cutter -- version A

The replacement for the Island class cutters was to be the Fast Response cutter, which was to be built incorporating novel materials, like a composite hull. In 2007 Allen announced that the original design would be abandoned, and an alternate design, Fast Response Cutter -- version B, would be built instead. The alternate design would focus on proven, "off the shelf" technology. The alternate design had a steel hull, and aluminium superstructure. Its design was a modification of a proven design licensed from the Dutch shipbuilding consortium the Damen Group.

References